<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Eggborough Power Station &#8211; Power Stations of the UK</title>
	<atom:link href="https://www.powerstations.uk/category/eggborough-power-station/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.powerstations.uk</link>
	<description>Documenting the decline of coal and oil fired electricity generation in the UK</description>
	<lastBuildDate>Sat, 04 Jan 2020 13:32:04 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.4</generator>

<image>
	<url>https://www.powerstations.uk/wp-content/uploads/sites/3/2023/04/cropped-power-stations-icon-32x32.png</url>
	<title>Eggborough Power Station &#8211; Power Stations of the UK</title>
	<link>https://www.powerstations.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Eggborough Power Station, North Yorkshire</title>
		<link>https://www.powerstations.uk/eggborough-power-station-north-yorkshire/</link>
					<comments>https://www.powerstations.uk/eggborough-power-station-north-yorkshire/#comments</comments>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:23 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<category><![CDATA[Power Stations]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=2356</guid>

					<description><![CDATA[The 2 Gigawatt Eggborough power station in Yorkshire was comprised of four 500 megawatt units supplied by AEI. The first unit started generating electricity in 1967.]]></description>
										<content:encoded><![CDATA[<p><img fetchpriority="high" decoding="async" class="header_image aligncenter size-large wp-image-2843" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-cover-1024x340.jpg" alt="Eggborough Power Station, North Yorkshire" width="1024" height="340" /></p>
<p>Eggborough Power Station was a 2 gigawatt coal-fired generating plant in North Yorkshire, England. The station comprised four 500 megawatt units, with generating sets supplied by AEI. Construction began in 1962 and the first unit started generating electricity in 1967. Construction was completed by September 1970.</p>
<figure id="attachment_2839" aria-describedby="caption-attachment-2839" style="width: 300px" class="wp-caption alignright"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965.jpg"><img decoding="async" class="size-medium wp-image-2839" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965-300x200.jpg" alt="Station under construction, 1965. Aerial view from the south-west" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-construction-1965.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2839" class="wp-caption-text">Station under construction, 1965. Aerial view from the south-west</figcaption></figure>
<p>The station was commissioned and initially operated by the Central Electricity Generating Board (CEGB) and became the property of National Power upon privatisation in 1990. British Energy bought the power station in 2000. British energy was purchased by EDF in 2009, however Eggborough’s lenders had the option to purchase the station the following April. On 1 April 2010, EDF transferred Eggborough to the plant&#8217;s bondholders. In January 2015 the sale of the power station to Czech Republic-based Energetický a průmyslový holding was finalised.</p>
<figure id="attachment_2838" aria-describedby="caption-attachment-2838" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior.jpg"><img decoding="async" class="size-large wp-image-2838" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior-1024x594.jpg" alt="Eggborouhg Power Station (image from the official opening booklet, 1970)" width="1024" height="594" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior-1024x594.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior-300x174.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior-768x445.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-exterior.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2838" class="wp-caption-text">Eggborouhg Power Station (image from the official opening booklet, 1970)</figcaption></figure>
<p>The low-pressure (LP) turbines of Units 1, 3 and 4 were replaced between 1993-1995 and the high-pressure (HP) turbines of Units 3 and 4 were replaced between 2005-2007. These upgrades increased the plants thermal efficiency and output.</p>
<figure id="attachment_2840" aria-describedby="caption-attachment-2840" style="width: 210px" class="wp-caption alignleft"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2840" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970-210x300.jpg" alt="The 650 feet high chimney" width="210" height="300" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970-210x300.jpg 210w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970-768x1098.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970-716x1024.jpg 716w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-chimney-1970.jpg 1177w" sizes="(max-width: 210px) 100vw, 210px" /></a><figcaption id="caption-attachment-2840" class="wp-caption-text">The 650 feet high chimney</figcaption></figure>
<p>The power station had one chimney which was 198.5m tall, was 21.6m wide at the base and tapered to 18.6m at the top. The chimney contained four 6.1m diameter flue ducts. There were 8 natural draught cooling towers, each 114m tall and 86.5m wide at the base.</p>
<p>In 1998 electrostatic precipitators were fitted to all units, and Flue Gas De-sulphurisation (FGD) was added to units 3 and 4 in 2005. Between 2005-2007 a boiler burner and combustion air system BOFA (Boosted Over Fire Air) commenced on Units 1, 3 and 4 to reduce Nitrogen Oxide emissions.</p>
<p>Eggborough and <a href="http://www.powerstations.uk/ferrybridge-c-power-station-west-yorkshire/">Ferrybridge</a> power stations pumped ash from their boilers to a disposal site to the south of both stations, called <a href="http://www.powerstations.uk/gale-common-ash-disposal-site/">Gale Common Ash Disposal Site</a>. The site is owned by Eggborough Power, and was landscaped by Brenda Colvin into 160m hills with contours.</p>
<p>Eggborough faced the threat of closure for a few years, and in 2018 it was announced it would close by September that year. The power station stopped generating on 23 March 2018.</p>
<h2>Buildings and Plant Detail</h2>
<!-- imagelinks begin -->
<style>
@import url("https://www.powerstations.uk/wp-content/plugins/imagelinks/lib/imagelinks.theme.default.css?ver=imagelinks");
</style>
<div id="imgl-data-mhjfk-2749" style="display:none;">
<div id="imgl-data-mhjfk-popover-0"><h4 style="text-align: center;"><a href="http://www.powerstations.uk/eggborough-turbines/">Turbine Hall</a><br /><a href="http://www.powerstations.uk/eggborough-turbines/"><img loading="lazy" decoding="async" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb-150x150.jpg" alt="Eggborough Power Station Turbines" width="150" height="150" class="aligncenter size-thumbnail wp-image-2794" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-mhjfk-popover-1"><h4 style="text-align: center;"><a href="http://www.powerstations.uk/eggborough-boiler-house/">Boiler House</a><br /><a href="http://www.powerstations.uk/eggborough-boiler-house/"><img loading="lazy" decoding="async" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb-150x150.jpg" alt="Eggborough Power Station Boilers and Mills" width="150" height="150" class="aligncenter size-thumbnail wp-image-2822" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-mhjfk-popover-2"><h4 style="text-align: center;"><a href="http://www.powerstations.uk/eggborough-control-room/">Control Room</a><br /><a href="http://www.powerstations.uk/eggborough-control-room/"><img loading="lazy" decoding="async" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb-150x150.jpg" alt="Eggborough Power Station Control Room" width="150" height="150" class="aligncenter size-thumbnail wp-image-2792" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-mhjfk-popover-3"><h4 style="text-align: center;"><a href="http://www.powerstations.uk/eggborough-workshops/">Workshops</a><br /><a href="http://www.powerstations.uk/eggborough-workshops/"><img loading="lazy" decoding="async" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb-150x150.jpg" alt="Eggborough Power Station Workshops" width="150" height="150" class="aligncenter size-thumbnail wp-image-2796" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-mhjfk-popover-4"><h4 style="text-align: center;"><a href="http://www.powerstations.uk/eggborough-coal-handling/">Coal Handling</a><br /><a href="http://www.powerstations.uk/eggborough-coal-handling/"><img loading="lazy" decoding="async" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb-150x150.jpg" alt="Eggborough Power Station Coal Handling Plant" width="150" height="150" class="aligncenter size-thumbnail wp-image-2790" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
</div>
<img decoding="async" id="imgl-mhjfk-2749" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/09/eggborough-site-plan.gif" data-imgl-src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/09/eggborough-site-plan.gif" alt=""><script type="text/javascript">
function imgl_init_mhjfk_2749() {
jQuery( "#imgl-mhjfk-2749" ).imagelinks({
theme: "imgl-theme-default",
popover: true,
popoverPlacement: "top",
popoverShowTrigger: "hover",
popoverHideTrigger: "leave",
hotSpotBelowPopover: true,
mobile: false,
hotSpots: [
{
x: 0.42873,
y: 0.43609,
link: "http://www.powerstations.uk/eggborough-turbines/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-mhjfk-popover-0",
popoverShow: false,
},
{
x: 0.46237,
y: 0.54359,
link: "http://www.powerstations.uk/eggborough-boiler-house/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-mhjfk-popover-1",
popoverShow: false,
},
{
x: 0.39509,
y: 0.49359,
link: "http://www.powerstations.uk/eggborough-control-room/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-mhjfk-popover-2",
popoverShow: false,
},
{
x: 0.43193,
y: 0.62109,
link: "http://www.powerstations.uk/eggborough-workshops/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-mhjfk-popover-3",
popoverShow: false,
},
{
x: 0.51843,
y: 0.87859,
link: "http://www.powerstations.uk/eggborough-coal-handling/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-mhjfk-popover-4",
popoverShow: false,
},
]
});
}
if(window.attachEvent) {window.attachEvent("onload",imgl_init_mhjfk_2749)}
else if(window.addEventListener) {window.addEventListener("load",imgl_init_mhjfk_2749, false)}
</script>
<!-- imagelinks end -->

<div>
<div class="article_link_box_50">
<p><a href="http://www.powerstations.uk/eggborough-turbines/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2794" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb.jpg" alt="Eggborough Power Station Turbines" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Turbine Hall</a></p>
<p class="smaller_txt">Eggborough had 4 x 500MW turbine-generator sets manufactured by AEI</p>
<p><a class="btn btn-edit" href="http://www.powerstations.uk/eggborough-turbines/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://www.powerstations.uk/eggborough-boiler-house/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2822" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb.jpg" alt="Eggborough Power Station Boilers and Mills" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-mills-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Boiler House</a></p>
<p class="smaller_txt">The four boilers at Eggborough were manufactured by Foster Wheeler / John Brown.</p>
<p><a class="btn btn-edit" href="http://www.powerstations.uk/eggborough-boiler-house/">Read more</a></p>
</div>
<div class="clearer"></div>
<div class="article_link_box_50">
<p><a href="http://www.powerstations.uk/eggborough-control-room/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2792" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb.jpg" alt="Eggborough Power Station Control Room" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Control Room</a></p>
<p class="smaller_txt">The control room at Eggborough remained largely original</p>
<p><a class="btn btn-edit" href="http://www.powerstations.uk/eggborough-control-room/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://www.powerstations.uk/eggborough-workshops/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2796" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb.jpg" alt="Eggborough Power Station Workshops" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Workshops</a></p>
<p class="smaller_txt">The well-equipped workshops were attached to the north-end of the station.</p>
<p><a class="btn btn-edit" href="http://www.powerstations.uk/eggborough-workshops/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://www.powerstations.uk/eggborough-coal-handling/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2790" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb.jpg" alt="Eggborough Power Station Coal Handling Plant" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Coal Handling Plant</a></p>
<p class="smaller_txt">The coal plant could store 1.75 million tons of coal and had a bucket-wheel excavator.</p>
<p><a class="btn btn-edit" href="http://www.powerstations.uk/eggborough-coal-handling/">Read more</a></p>
</div>
<div class="clearer"></div>
</div>
<h2>Eggborough Image Gallery</h2>
<p class="green_outline">Visit the plant detail pages above to view more images from each area of the power plant</p>
<figure id="attachment_2886" aria-describedby="caption-attachment-2886" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2886" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1-1024x542.jpg" alt="Sunrise over Eggborough Power Station viewed from the west" width="1024" height="542" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1-1024x542.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1-300x159.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1-768x407.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-1.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2886" class="wp-caption-text">Sunrise over Eggborough Power Station viewed from the west</figcaption></figure>
<p>
<a href='https://www.powerstations.uk/eggborough-power-station-north-yorkshire/eggborough-power-station-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Eggborough Power Station viewed from the south" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-power-station-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-power-station-north-yorkshire/eggborough-cooling-towers-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Some of the cooling towers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-power-station-north-yorkshire/eggborough-cooling-towers-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Cooling towers and station viewed from the chimney" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-cooling-towers-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="The turbine hall of Eggborough Power Station" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-11/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 3 turbines and generator set" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 2 control desks" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-pf-mills-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="PF Mills, unit 1B in the foreground" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-bucket-wheel-excavator-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Bucket Wheel Excavator / Giant Boom Stacker" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<br />
</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.powerstations.uk/eggborough-power-station-north-yorkshire/feed/</wfw:commentRss>
			<slash:comments>6</slash:comments>
		
		
			</item>
		<item>
		<title>Eggborough Power Station &#8211; Turbines</title>
		<link>https://www.powerstations.uk/eggborough-turbines/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:30 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=2358</guid>

					<description><![CDATA[Eggborough Power Station had four 500 MW turbo-generator sets manufactured by AEI.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2793" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-cover-1024x304.jpg" alt="Eggborough Turbine Hall" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>Eggborough Power Station had four 500 MW turbo-generator sets manufactured by AEI. The large turbine hall, as with the entire station, was an almost duplicate of Ironbridge, only with double the number of units. The HP heaters were situated between each unit and form a prominent feature of the turbine hall.</p>
<figure id="attachment_2807" aria-describedby="caption-attachment-2807" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2807" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-1024x683.jpg" alt="The turbine hall of Eggborough Power Station" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-4.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2807" class="wp-caption-text">The turbine hall of Eggborough Power Station</figcaption></figure>
<p>Each turbine line consisted 5 tandem compound cylinders; one high pressure (HP) turbine, one intermediate pressure (IP) turbine, followed by three low pressure (LP) turbines. Steam entered with a pressure of 158.6 bar at 566°C. When steam from the boilers had passed through the high pressure cylinder of the turbine, it was returned to the boiler, reheated and then circulated through the intermediate pressure cylinder before passing to the three low pressure turbines. It was then passed into the condensers where it was condensed back into water before being pumped back to the boiler.</p>
<p>The turbine house had two single span overhead travelling cranes, each of 115 tins capacity. A lifting beam between these two cranes could be used for lifting the heaviest load &#8211; the generator stator, which weighed 210 tons.</p>
<h3>Eggborough Generating Units</h3>
<p>List of power generating units at Eggborough Power Station:<br />
<div class="supsystic-table-loader spinner"style="background-color:#000000"></div><div id="supsystic-table-15_17766" class="supsystic-tables-wrap " style=" width:100%; visibility: hidden; " data-table-width-fixed="100%" data-table-width-mobile="100%" ><table id="supsystic-table-15" class="supsystic-table compact nowrap paragraphMode border stripe lightboxImg row-border" data-id="15" data-view-id="15_17766" data-title="Eggborough Generating Units" data-currency-format="$1,000.00" data-percent-format="10.00%" data-date-format="DD.MM.YYYY" data-time-format="HH:mm" data-features="[&quot;after_table_loaded_script&quot;]" data-search-value="" data-lightbox-img="" data-head="on" data-head-rows-count="1" data-fixed-cols="on" data-fixed-left="1" data-fixed-right="0" data-pagination-length="50,100,All" data-auto-index="off" data-searching-settings="{&quot;minChars&quot;:&quot;0&quot;}" data-lang="default" data-override="{&quot;emptyTable&quot;:&quot;&quot;,&quot;info&quot;:&quot;&quot;,&quot;infoEmpty&quot;:&quot;&quot;,&quot;infoFiltered&quot;:&quot;&quot;,&quot;lengthMenu&quot;:&quot;&quot;,&quot;search&quot;:&quot;&quot;,&quot;zeroRecords&quot;:&quot;&quot;,&quot;exportLabel&quot;:&quot;&quot;,&quot;file&quot;:&quot;default&quot;}" data-merged="[]" data-responsive-mode="2" data-from-history="0" ><thead><tr><th data-cell-id="A1" data-x="0" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Unit Name" data-order="Unit Name" style="min-width:14.2857%; width:14.2857%;" >Unit Name </th><th data-cell-id="B1" data-x="1" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Capacity" data-order="Capacity" style="min-width:14.2857%; width:14.2857%;" >Capacity </th><th data-cell-id="C1" data-x="2" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Commissioned" data-order="Date &lt;br /&gt;Commissioned" style="min-width:14.2857%; width:14.2857%;" >Date <br />Commissioned </th><th data-cell-id="D1" data-x="3" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Decommissioned" data-order="Date &lt;br /&gt;Decommissioned" style="min-width:14.2857%; width:14.2857%;" >Date <br />Decommissioned </th><th data-cell-id="E1" data-x="4" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Turbine/Generator &lt;br /&gt;Manufacturer" data-order="Turbine/Generator &lt;br /&gt;Manufacturer" style="min-width:14.2857%; width:14.2857%;" >Turbine/Generator <br />Manufacturer </th><th data-cell-id="F1" data-x="5" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Boiler &lt;br /&gt;Manufacturer" data-order="Boiler &lt;br /&gt;Manufacturer" style="min-width:14.2857%; width:14.2857%;" >Boiler <br />Manufacturer </th><th data-cell-id="G1" data-x="6" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Notes" data-order="Notes" style="min-width:14.2857%; width:14.2857%;" >Notes </th></tr></thead><tbody><tr style="height:px" ><td data-cell-id="A2" data-x="0" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Unit 1" data-order="Unit 1" >Unit 1 </td><td data-cell-id="B2" data-x="1" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="490 MW" data-order="490 MW" >490 MW </td><td data-cell-id="C2" data-x="2" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="1967" data-order="1967" >1967 </td><td data-cell-id="D2" data-x="3" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="16 March 2018" data-order="16 March 2018" >16 March 2018 </td><td data-cell-id="E2" data-x="4" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F2" data-x="5" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Foster Wheeler" data-order="Foster Wheeler" >Foster Wheeler </td><td data-cell-id="G2" data-x="6" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="" data-order="" ></td></tr><tr style="height:px" ><td data-cell-id="A3" data-x="0" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Unit 2" data-order="Unit 2" >Unit 2 </td><td data-cell-id="B3" data-x="1" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="480 MW" data-order="480 MW" >480 MW </td><td data-cell-id="C3" data-x="2" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="1968" data-order="1968" >1968 </td><td data-cell-id="D3" data-x="3" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="16 March 2018" data-order="16 March 2018" >16 March 2018 </td><td data-cell-id="E3" data-x="4" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F3" data-x="5" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Foster Wheeler" data-order="Foster Wheeler" >Foster Wheeler </td><td data-cell-id="G3" data-x="6" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="" data-order="" ></td></tr><tr style="height:px" ><td data-cell-id="A4" data-x="0" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Unit 3" data-order="Unit 3" >Unit 3 </td><td data-cell-id="B4" data-x="1" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="495 MW" data-order="495 MW" >495 MW </td><td data-cell-id="C4" data-x="2" data-y="4" data-db-index="4" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="1970" data-order="1970" >1970 </td><td data-cell-id="D4" data-x="3" data-y="4" data-db-index="4" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="21 March 2018" data-order="21 March 2018" >21 March 2018 </td><td data-cell-id="E4" data-x="4" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F4" data-x="5" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Foster Wheeler" data-order="Foster Wheeler" >Foster Wheeler </td><td data-cell-id="G4" data-x="6" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Retrofitted with Flue-gas Desulphurisation for LCPD compliance" data-order="Retrofitted with Flue-gas Desulphurisation for LCPD compliance" >Retrofitted with Flue-gas Desulphurisation for LCPD compliance </td></tr><tr style="height:px" ><td data-cell-id="A5" data-x="0" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Unit 4" data-order="Unit 4" >Unit 4 </td><td data-cell-id="B5" data-x="1" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="495 MW" data-order="495 MW" >495 MW </td><td data-cell-id="C5" data-x="2" data-y="5" data-db-index="5" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="1970" data-order="1970" >1970 </td><td data-cell-id="D5" data-x="3" data-y="5" data-db-index="5" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="23 March 2018" data-order="23 March 2018" >23 March 2018 </td><td data-cell-id="E5" data-x="4" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F5" data-x="5" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Foster Wheeler" data-order="Foster Wheeler" >Foster Wheeler </td><td data-cell-id="G5" data-x="6" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Retrofitted with Flue-gas Desulphurisation for LCPD compliance" data-order="Retrofitted with Flue-gas Desulphurisation for LCPD compliance" >Retrofitted with Flue-gas Desulphurisation for LCPD compliance </td></tr></tbody></table><!-- /#supsystic-table-15.supsystic-table --></div><!-- /.supsystic-tables-wrap --><!-- Tables Generator by Supsystic --><!-- Version:1.10.31 --><!-- http://supsystic.com/ --><a title="WordPress Data Table Plugin" style="display:none;" href="https://supsystic.com/plugins/wordpress-data-table-plugin/?utm_medium=love_link" target="_blank">WordPress Data Table Plugin</a></p>
<h2>Turbine Hall Pictures</h2>
<figure id="attachment_2849" aria-describedby="caption-attachment-2849" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970.jpg"><img loading="lazy" decoding="async" class="wp-image-2849 size-large" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970-1024x643.jpg" alt="Turbine hall, 1970, with No. 1 generator in the foreground." width="1024" height="643" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970-1024x643.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970-300x188.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970-768x482.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbine-hall-1970.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2849" class="wp-caption-text">Turbine hall, 1970, with No. 1 generator in the foreground.</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-11/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 3 turbines and generator set" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-11-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Turbine hall viewed from HP end" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Turbine hall with Unit 1 in the foreground" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="View across units 3, 2 and 1" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-7/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-7-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 1 viewed from above" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-7-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-7-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 1 viewed from turbine level" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="HP end of Unit 2 turbines" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-turbines-10/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-10-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Side view of Unit 2" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-10-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-turbines-10-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Boiler Feed Pumps and Condenser Pictures</h2>

<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-boiler-feed-pump-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Units 2 and 3 Boiler Feed Pumps" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-boiler-feed-pump-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 1 Starting and Standby Boiler Feed Pump" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-feed-pump-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-condensers-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Condensers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-turbines/eggborough-condensers-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Condensers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-condensers-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Gas Turbines</h2>
<figure id="attachment_2889" aria-describedby="caption-attachment-2889" style="width: 300px" class="wp-caption alignright"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-gas-turbines-1970.jpg"><img loading="lazy" decoding="async" class="wp-image-2889 size-medium" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-gas-turbines-1970-300x240.jpg" alt="The gas turbines, pictured in 1970" width="300" height="240" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-gas-turbines-1970-300x240.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-gas-turbines-1970-768x614.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-gas-turbines-1970.jpg 971w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2889" class="wp-caption-text">The gas turbines, pictured in 1970</figcaption></figure>
<p>In power stations of this size it was the practice of the CEGB to install gas turbine generators to provide stand-by supplies for station auxiliaries, to provide starting facilities from &#8216;cold&#8217;, and to supplement the station output under peak load conditions. Four Bristol Siddeley 17.5 MW gas turbine units were installed at Eggborough. Each unit could be started and brought up to full load within two minutes. The gas turbines were decommissioned many years before the station closed.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/eggborough-turbines/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eggborough Power Station &#8211; Boiler House and Mills</title>
		<link>https://www.powerstations.uk/eggborough-boiler-house/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:39 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=2360</guid>

					<description><![CDATA[The boiler house at Eggborough Power Station contained the steam generating boilers and pulverised fuel mills.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2798" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boilers-cover-1024x304.jpg" alt="Eggborough Boiler House and Mills" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boilers-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boilers-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boilers-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The boiler house at Eggborough Power Station contained the steam generating boilers and pulverised fuel mills. The four reheat boiler units were manufactured by Foster Wheeler / John Brown, were single furnace, front wall fired, natural circulation water tube boilers. The boilers had an evaporation capacity of 422 kg/s at 165 bar. The superheated steam temperature was 568°C.</p>
<figure id="attachment_2878" aria-describedby="caption-attachment-2878" style="width: 300px" class="wp-caption alignright"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2878" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5-300x200.jpg" alt="Rear of Unit 1 Boiler" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-5.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2878" class="wp-caption-text">Rear of Unit 1 Boiler</figcaption></figure>
<p>When the station was on full load each boiler would burn about 200 tons of coal per hour, giving a total for the whole station of 19,200 tons per day. The walls of the furnace were composed of 2.5 inch bore steel tubes filled with water which was turned into steam by the heat from the furnace.</p>
<p>The coal passed through pulverising mills where it was ground to a fine powder before being blown into the furnaces by a heated air stream. The pulverised fuel mills were also manufactured by Foster Wheeler / John Brown. There were 24 PF mills, 6 per unit. The mills were horizontal ball mills (D9 type). The FD Fans and ID Fans were supplied by James Howden. The &#8220;Lagos&#8221; drag link coal feeders were supplied by Redler, and there were two per mill.</p>
<h2>Boiler House Pictures</h2>
<figure id="attachment_2876" aria-describedby="caption-attachment-2876" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2876" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4-1024x683.jpg" alt="Eggborough Power Station Boiler House" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-4.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2876" class="wp-caption-text">Eggborough Power Station Boiler House</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-boiler-house-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Base of ash hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boiler-house-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-fd-fans-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-fd-fans-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Forced Draught (FD) Fans" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-fd-fans-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-fd-fans-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-ash-hopper-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-ash-hopper-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Dust hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-ash-hopper-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-ash-hopper-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-compressors-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-compressors-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Compressor room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-compressors-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-compressors-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Pulverised Fuel Mill and Fuel Delivery Pictures</h2>
<figure id="attachment_2868" aria-describedby="caption-attachment-2868" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2868" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2-1024x683.jpg" alt="Pulverised Fuel (PF) Mills, with unit 4E in the foreground" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-2.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2868" class="wp-caption-text">Pulverised Fuel (PF) Mills, with unit 4E in the foreground</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-pf-mills-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="PF Mills, unit 1B in the foreground" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-pf-mills-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Rear of unit 3 E &amp; D mills" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-pf-mills-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-coal-feeders-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-feeders-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Coal feeders" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-feeders-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-feeders-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-boiler-house/eggborough-coal-bunkers-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-bunkers-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Top of coal bunkers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-bunkers-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-bunkers-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/eggborough-boiler-house/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eggborough Power Station &#8211; Control Room</title>
		<link>https://www.powerstations.uk/eggborough-control-room/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:43 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=2363</guid>

					<description><![CDATA[The spacious and airy central control room at Eggborough contained the control desks for all four units.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2791" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-cover-1024x304.jpg" alt="Eggborough Control Room" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The spacious and airy central control room at Eggborough contained the control desks for all four units, plus engineering and station services. Each unit had its own control station, wrapping around the corners of the square layout. Engineering and controls for station facilities were placed in the centre.</p>
<figure id="attachment_2880" aria-describedby="caption-attachment-2880" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2880" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970-1024x482.jpg" alt="The Central Control Room at Eggborough Power Station, 1970" width="1024" height="482" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970-1024x482.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970-300x141.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970-768x362.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1970.jpg 1688w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2880" class="wp-caption-text">The Central Control Room at Eggborough Power Station, 1970</figcaption></figure>
<p>Between 1996-2000 the control desks at Eggborough were upgraded to incorporate Advanced Plant Management System (APMS) soft desks into the existing Cutlass interfaces. The system enabled the station to move from base load to multishifting in a fast and economical manner. A further upgrade completed in 2011 transferred the controls for the mills, draught and coal delivery to APACS soft desks.</p>
<h2>Control Room Pictures</h2>
<figure id="attachment_2774" aria-describedby="caption-attachment-2774" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2774" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6-1024x499.jpg" alt="Unit 1 control panels" width="1024" height="499" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6-1024x499.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6-300x146.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6-768x374.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-6.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2774" class="wp-caption-text">Unit 1 control panels</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-8/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-8-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 3 panels and unit 4 controls behindv" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-8-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-8-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-10/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-10-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 3 control desks" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-10-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-10-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 2 control desks" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Control room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-9/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-9-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Works Power Board" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-9-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-9-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Grid connections panel" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Grid connections and synchroscope" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-control-room/eggborough-control-room-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Station Services Panel" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-control-room-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/eggborough-control-room/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eggborough Power Station &#8211; Workshops</title>
		<link>https://www.powerstations.uk/eggborough-workshops/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:46 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<guid isPermaLink="false">http://www.powerstations.uk/?p=2754</guid>

					<description><![CDATA[The workshops at Eggborough were well equipped with various machines for metalworking.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2795" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-cover-1024x304.jpg" alt="Eggborough Workshops" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The workshops at Eggborough Power Station were well equipped with various machines for metalworking. The workshop were located in a single story building connected to the main building, directly behind the admin block.</p>
<h2>Workshop Pictures</h2>
<figure id="attachment_2861" aria-describedby="caption-attachment-2861" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2861" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5-1024x683.jpg" alt="Metalworking machinery in the main workshop" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-5.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2861" class="wp-caption-text">Metalworking machinery in the main workshop</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-workshops/eggborough-workshops-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Drillpress and grinders" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-workshops/eggborough-workshops-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Lathes in the workshop" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-workshops/eggborough-workshops-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Machines in the workshop" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-workshops/eggborough-workshops-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Large metalworking lathes" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-workshops-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/eggborough-workshops/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Eggborough Power Station &#8211; Coal Handling</title>
		<link>https://www.powerstations.uk/eggborough-coal-handling/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:30:50 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<guid isPermaLink="false">http://www.powerstations.uk/?p=2752</guid>

					<description><![CDATA[Eggborough could store 1.75 million tons of coal and utilised the countries first giant boom stacker and bucket wheel excavator.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2799" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-cover-1024x304.jpg" alt="Eggborough Coal Handling Plant" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_2851" aria-describedby="caption-attachment-2851" style="width: 300px" class="wp-caption alignright"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2851" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-300x136.jpg" alt="A &quot;merry-go-round&quot; train delivering coal, 1970" width="300" height="136" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-300x136.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-768x349.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-1024x465.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-1110x500.jpg 1110w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970-517x235.jpg 517w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-merry-go-round-train-1970.jpg 1789w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2851" class="wp-caption-text">A &#8220;merry-go-round&#8221; train delivering coal, 1970</figcaption></figure>
<p>The 345 acre coal storage yard at Eggborough power station had a capacity of 1.75 million tons of coal, which is equivalent to 15 weeks supply. Fuel was originally drawn from the Yorkshire coalfields and consisted of small coals unsuitable for domestic use. The coal was delivered by rail, with a complete loop from the mainline enabling the coal trains to discharge while in motion, commonly know as a merry-go-round system. Each train carried about 1,000 tons of coal and could be unloaded and returned to the mainline in around 45 minutes.</p>
<p>A giant boom stacker was used to deliver coal to the stock yard at a rate of 3,000 tons per hour, and reclaimed using a bucket-wheel at 1,500 tons per hour. This was the first such system to be used in the UK.</p>
<h2>Coal Handling Pictures</h2>
<figure id="attachment_2855" aria-describedby="caption-attachment-2855" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2855" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4-1024x683.jpg" alt="Bucket Wheel Excavator / Giant Boom Stacker" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-bucket-wheel-excavator-4.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2855" class="wp-caption-text">Bucket Wheel Excavator / Giant Boom Stacker</figcaption></figure>

<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-rail-unloader-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Inside the rail unloading facility" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-rail-unloader-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Conveyors below the rail unloader" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-rail-unloader-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-coal-plant-aerial-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-aerial-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="View over the coal yard and handling facilities" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-aerial-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-plant-aerial-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-boom-stacker-1970/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boom-stacker-1970-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Giant boom stacker in operation, 1970" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boom-stacker-1970-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-boom-stacker-1970-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Documents and Schematics</h2>

<a href='https://www.powerstations.uk/eggborough-power-station-north-yorkshire/eggborough-coal-handling-plant-plan/'><img loading="lazy" decoding="async" width="300" height="157" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-handling-plant-plan-300x157.jpg" class="attachment-medium size-medium" alt="Coal handling plant" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-handling-plant-plan-300x157.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-handling-plant-plan-768x403.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-handling-plant-plan-1024x537.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-coal-handling-plant-plan.jpg 2008w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/eggborough-coal-handling/eggborough-railway-track-layout-plan/'><img loading="lazy" decoding="async" width="300" height="273" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-railway-track-layout-plan-300x273.jpg" class="attachment-medium size-medium" alt="Track layout and signalling" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-railway-track-layout-plan-300x273.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-railway-track-layout-plan-768x699.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-railway-track-layout-plan-1024x932.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/11/eggborough-railway-track-layout-plan.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/eggborough-power-station-north-yorkshire/"><i class="arrow icn-left-open-big"></i>Back to Eggborough main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/eggborough-coal-handling/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Gale Common Ash Disposal Site, North Yorkshire</title>
		<link>https://www.powerstations.uk/gale-common-ash-disposal-site/</link>
					<comments>https://www.powerstations.uk/gale-common-ash-disposal-site/#comments</comments>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Sun, 10 Nov 2019 19:34:35 +0000</pubDate>
				<category><![CDATA[Eggborough Power Station]]></category>
		<category><![CDATA[Ferrybridge C Power Station]]></category>
		<guid isPermaLink="false">http://www.powerstations.uk/?p=2658</guid>

					<description><![CDATA[The Gale Common Ash Disposal Site is a facility for the processing and storage of Pulverised Fuel Ash (PFA) from Ferrybridge and Eggborough power stations. The PFA is formed into hills and then landscaped.]]></description>
										<content:encoded><![CDATA[<p><img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-2663" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-cover-1024x340.jpg" alt="Gale Common Ash Disposal Site, North Yorkshire" width="1024" height="340" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-cover.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-cover-300x100.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-cover-768x255.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The Gale Common Ash Disposal Site is a facility for the processing and long-term storage of Pulverised Fuel Ash (PFA) from <a href="http://www.powerstations.uk/ferrybridge-c-power-station-west-yorkshire/">Ferrybridge</a> and <a href="http://www.powerstations.uk/eggborough-power-station-north-yorkshire/">Eggborough</a> power stations. The PFA is formed into hills and then landscaped.</p>
<figure id="attachment_2672" aria-describedby="caption-attachment-2672" style="width: 300px" class="wp-caption alignright"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1.jpg"><img loading="lazy" decoding="async" class="wp-image-2672 size-medium" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1-300x225.jpg" alt="Settlement ponds and pumphouse in the foreground, the completed Stage I to the right and Eggborough and Drax power stations in the distance" width="300" height="225" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1-300x225.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1-768x576.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1-1024x768.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-1.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2672" class="wp-caption-text">Settlement ponds and pumphouse in the foreground, the completed Stage I to the right and Eggborough and Drax power stations in the distance</figcaption></figure>
<p>The burning of pulverised coal in large-scale industrial processes such as power stations produces large quantities of ash, known as pulverised fuel ash, or PFA. Gale Common is the largest disposal scheme in the UK, capable of receiving 49 million m<sup>3</sup> of PFA annually in slurry form from Eggborough and Ferrybridge power stations, located 5km and 7km away from the site, via underground pipelines. The site also received 16 million m<sup>3</sup> of spoil from the nearby Kellingley Colliery.</p>
<p>The site has been developed in three phases – I to III. Stage I was completed in 1994, reaching a height of 69 metres, and has since been restored and landscaped. Stages II and III are not yet complete, however the closure of both Eggborough and Ferrybridge power stations means the site no longer receives any PFA.</p>
<h2>Gale Common Photos</h2>
<figure id="attachment_2669" aria-describedby="caption-attachment-2669" style="width: 1024px" class="wp-caption aligncenter"><a href="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2669" src="http://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5-1024x768.jpg" alt="Former processing facility and Stage III behind" width="1024" height="768" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5-1024x768.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5-300x225.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5-768x576.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-5.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2669" class="wp-caption-text">Former processing facility and Stage III behind</figcaption></figure>

<a href='https://www.powerstations.uk/gale-common-ash-disposal-site/gale-common-ash-disposal-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="View over lagoons C &amp; D" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/gale-common-ash-disposal-site/gale-common-ash-disposal-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Processing plant for slurry dewatering" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/gale-common-ash-disposal-site/gale-common-ash-disposal-7/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-7-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Belt filter inside the plant buildings" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-7-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-7-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/gale-common-ash-disposal-site/gale-common-ash-disposal-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Filtration and settlement processes" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2019/05/gale-common-ash-disposal-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>The Gale Common Extraction Project</h2>
<p>PFA can be used as a recycled aggregate in the construction industry. There are a range of uses including road construction, building embankments and the manufacture of blocks, tiles and slabs.</p>
<p>Currently, up to 30,000 tonnes of PFA can be extracted from the stockpiles per year, and sold on to the customers in the construction industry. Plans have been submitted to develop the facilities at the site, allowing for up to 1 million tonnes of PFA to be extracted per year, for a period of 25 years. The extraction will take place from Stages II and III, leaving the completed Stage I as it is.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.powerstations.uk/gale-common-ash-disposal-site/feed/</wfw:commentRss>
			<slash:comments>1</slash:comments>
		
		
			</item>
	<ins class="adsbygoogle" style="display:block" data-ad-client="ca-pub-9853931659802057" data-ad-slot="4954481773" data-ad-format="auto" data-full-width-responsive="true"></ins><script>(adsbygoogle = window.adsbygoogle || []).push({});</script></channel>
</rss>
