<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Ironbridge B Power Station &#8211; Power Stations of the UK</title>
	<atom:link href="https://www.powerstations.uk/category/ironbridge-power-station/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.powerstations.uk</link>
	<description>Documenting the decline of coal and oil fired electricity generation in the UK</description>
	<lastBuildDate>Mon, 28 Sep 2020 12:46:54 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.4</generator>

<image>
	<url>https://www.powerstations.uk/wp-content/uploads/sites/3/2023/04/cropped-power-stations-icon-32x32.png</url>
	<title>Ironbridge B Power Station &#8211; Power Stations of the UK</title>
	<link>https://www.powerstations.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Ironbridge B Power Station, Shropshire</title>
		<link>https://www.powerstations.uk/ironbridge-b-power-station-shropshire/</link>
					<comments>https://www.powerstations.uk/ironbridge-b-power-station-shropshire/#comments</comments>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Tue, 15 Aug 2017 09:36:54 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<category><![CDATA[Power Stations]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=107</guid>

					<description><![CDATA[The 1,000 MW Ironbridge Power Station opened in 1969 and consists of two 500MW AEI generating units. The station's cooling towers are uniquely coloured with a punk hue.]]></description>
										<content:encoded><![CDATA[<p><img fetchpriority="high" decoding="async" class="header_image aligncenter wp-image-498 size-full" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-power-station-cover.jpg" alt="Iironbridge Power Station, Shropshire" width="1024" height="340" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-power-station-cover.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-power-station-cover-300x100.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-power-station-cover-768x255.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The Ironbridge Power Stations, sometimes referred to as the Buildwas Power Stations were a series of two power stations which have occupied a site on the banks of the River Severn at Buildwas in Shropshire, England.</p>
<p>The first power station, later to become known as Ironbridge ‘A’ officially opened on 13th October 1932. Extra boilers were commissioned and by 1939 the station had a capacity of 200MW. In 1980 100MW of capacity was taken offline, and the remainder in 1981 when the station was closed.</p>
<figure id="attachment_411" aria-describedby="caption-attachment-411" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower.jpg"><img decoding="async" class="size-medium wp-image-411" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-300x200.jpg" alt="Ironbridge Power Station behind one of the cooling towers" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-411" class="wp-caption-text">Ironbridge Power Station behind one of the cooling towers</figcaption></figure>
<p>Construction of the Ironbridge ‘B’ station began in 1963 to meet the rising demand for electricity after World War II. The 1,000MW power station was built alongside the existing ‘A’ station and began generating electricity on 11th June 1969 after delays in construction owing to industrial action and implementation of improvements that had been pioneered during the construction of similar stations using the new <a href="http://powerstations.uk/ironbridge-turbines/">500 MW generating units</a>.</p>
<figure id="attachment_760" aria-describedby="caption-attachment-760" style="width: 300px" class="wp-caption alignleft"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape.jpg"><img decoding="async" class="size-medium wp-image-760" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape-300x200.jpg" alt="Ironbridge in the landscape" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-landscape.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-760" class="wp-caption-text">Ironbridge in the landscape</figcaption></figure>
<p>Project architect Alan Clark worked closely with landscape architect Kenneth Booth, to ensure that the station merged as seamlessly as possible into its natural surroundings. When viewed from Ironbridge, the surroundings of the station are hidden by wooded hills. <a href="http://powerstations.uk/ironbridge-cooling-towers/">The cooling towers</a> were constructed using concrete to which a red pigment had been added, to blend with the colour of the local soil. So impressive were the measures taken to ensure that the power station was an asset to the gorge and not an eyesore, that it was short listed for a Royal Institution of Chartered Surveyors/The Times conservation award in 1973.</p>
<figure id="attachment_685" aria-describedby="caption-attachment-685" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-685" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-300x200.jpg" alt="The original control room in 1993. Note the illuminated ceiling" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-768x513.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-1024x684.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-685" class="wp-caption-text">The original control room in 1993. Note the illuminated ceiling</figcaption></figure>
<p>In 2012 Ironbridge underwent modification to allow both generating units to run on 100% biomass. This reduced the generating capacity from 500MW per unit to approximately 370MW per unit.</p>
<p>In February 2014 a serious fire damaged unit 1’s turbine and generator. It was later announced that the damage would not be repaired, reducing the plant’s generation capacity to just 370MW in total.</p>
<p>Ironbridge ‘B’ stopped generating electricity on 20 November 2015 when the power station was closed.</p>
<h2>Buildings and Plant Detail</h2>
<!-- imagelinks begin -->
<style>
@import url("https://www.powerstations.uk/wp-content/plugins/imagelinks/lib/imagelinks.theme.default.css?ver=imagelinks");
</style>
<div id="imgl-data-p8utk-126" style="display:none;">
<div id="imgl-data-p8utk-popover-0"><h4 style="text-align: center;"><a href="http://powerstations.uk/ironbridge-turbines/">Turbine Hall</a><br /><a href="http://powerstations.uk/ironbridge-turbines/"><img loading="lazy" decoding="async" class="aligncenter wp-image-404 size-thumbnail" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb-150x150.jpg" alt="Ironbridge Turbine Hall" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-p8utk-popover-1"><h4 style="text-align: center;"><a href="http://powerstations.uk/ironbridge-boiler-house/">Boiler House</a><br />and Mills<br /><a href="http://powerstations.uk/ironbridge-boiler-house/"><img loading="lazy" decoding="async" class="aligncenter wp-image-401 size-thumbnail" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb-150x150.jpg" alt="Ironbridge Boiler House" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-p8utk-popover-2"><h4 style="text-align: center;"><a href="http://powerstations.uk/ironbridge-control-room/">Control Room</a><br /><a href="http://powerstations.uk/ironbridge-control-room/"><img loading="lazy" decoding="async" class="aligncenter wp-image-402 size-thumbnail" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb-150x150.jpg" alt="Ironbridge Control Room" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-p8utk-popover-3"><h4 style="text-align: center;"><a href="http://powerstations.uk/ironbridge-admin-medical/">Admin Block</a><br /><a href="http://powerstations.uk/ironbridge-admin-medical/"><img loading="lazy" decoding="async" class="aligncenter wp-image-400 size-thumbnail" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb-150x150.jpg" alt="Ironbridge Admin" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-p8utk-popover-4"><h4 style="text-align: center;"><a href="http://powerstations.uk/ironbridge-cooling-towers/">Cooling Towers</a><br /><a href="http://powerstations.uk/ironbridge-cooling-towers/"><img loading="lazy" decoding="async" class="aligncenter wp-image-403 size-thumbnail" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb-150x150.jpg" alt="Ironbridge Cooling Towers" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
</div>
<img decoding="async" id="imgl-p8utk-126" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-site-plan.gif" data-imgl-src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-site-plan.gif" alt=""><script type="text/javascript">
function imgl_init_p8utk_126() {
jQuery( "#imgl-p8utk-126" ).imagelinks({
theme: "imgl-theme-default",
popover: true,
popoverPlacement: "top",
popoverShowTrigger: "hover",
popoverHideTrigger: "leave",
hotSpotBelowPopover: true,
mobile: false,
hotSpots: [
{
x: 0.48159,
y: 0.6,
link: "http://powerstations.uk/ironbridge-turbines/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-p8utk-popover-0",
popoverShow: false,
},
{
x: 0.49601,
y: 0.6725,
link: "http://powerstations.uk/ironbridge-boiler-house/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-p8utk-popover-1",
popoverShow: false,
},
{
x: 0.48319,
y: 0.55,
link: "http://powerstations.uk/ironbridge-control-room/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-p8utk-popover-2",
popoverShow: false,
},
{
x: 0.47999,
y: 0.49,
link: "http://powerstations.uk/ironbridge-admin-medical/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-p8utk-popover-3",
popoverShow: false,
},
{
x: 0.76993,
y: 0.495,
link: "http://powerstations.uk/ironbridge-cooling-towers/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-p8utk-popover-4",
popoverShow: false,
},
]
});
}
if(window.attachEvent) {window.attachEvent("onload",imgl_init_p8utk_126)}
else if(window.addEventListener) {window.addEventListener("load",imgl_init_p8utk_126, false)}
</script>
<!-- imagelinks end -->

<div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/ironbridge-turbines/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-404" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb.jpg" alt="Ironbridge Turbine Hall" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Turbine Hall</a></p>
<p class="smaller_txt">The turbine hall at Ironbridge housed 2 sets of 500MW AEI generating units.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-turbines/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/ironbridge-boiler-house/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-401" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb.jpg" alt="Ironbridge Boiler House" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Boiler House and Mills</a></p>
<p class="smaller_txt">The boiler house contains two Forster Wheeler boilers.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-boiler-house/">Read more</a></p>
</div>
<div class="clearer"></div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/ironbridge-control-room/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-402" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb.jpg" alt="Ironbridge Control Room" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Control Room</a></p>
<p class="smaller_txt">The control room was upgraded to APMS computerised system.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-control-room/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/ironbridge-admin-medical/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-400" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb.jpg" alt="Ironbridge Admin" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Admin Block</a></p>
<p class="smaller_txt">The admin block contains the medical centre, bathhouse and various other staff facilities.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-admin-medical/">Read more</a></p>
</div>
<div class="clearer"></div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/ironbridge-cooling-towers/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-403" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb.jpg" alt="Ironbridge Cooling Towers" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Cooling Towers</a></p>
<p class="smaller_txt">The cooling towers have a pink hue to help them blend into the landscape.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-cooling-towers/">Read more</a></p>
</div>
<div class="clearer"></div>
</div>
<h2>Ironbridge Power Station Image Gallery</h2>
<p class="green_outline">Visit the plant detail pages above to view more images from each area of the power plant</p>

<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-11/'><img loading="lazy" decoding="async" width="300" height="122" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-300x122.jpg" class="attachment-medium size-medium" alt="Unit Two Turbo Generator with the exciter on the left, alternator central and LP turbines to the right" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-300x122.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-768x312.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-1024x416.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-300x200.jpg" class="attachment-medium size-medium" alt="Turbines viewed from the crane" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-cooling-towers/ironbridge-cooling-towers-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-300x200.jpg" class="attachment-medium size-medium" alt="Three of the four cooling towers viewed from the power station" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-300x200.jpg" class="attachment-medium size-medium" alt="Control room from behind the engineering workstation" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-12/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-300x200.jpg" class="attachment-medium size-medium" alt="Gantries around the boilers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-fire-damage-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-6-300x200.jpg" class="attachment-medium size-medium" alt="Diesel Fire Pumps" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h2>Fires at Ironbridge</h2>
<figure id="attachment_664" aria-describedby="caption-attachment-664" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-664" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-300x200.jpg" alt="The fire damaged Unit One" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-664" class="wp-caption-text">The fire damaged Unit One</figcaption></figure>
<p>Two major incidents have occurred at Ironbridge involving fire. The first took place in 1998 and resulted in the entire turbine hall requiring reconstruction. The second incident in 2014 when unit 1 caught fire. The fire caused extensive damage to the turbine and generator set of unit 1, which was never returned to service.</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-turbines/#fires">Read more about the fires</a></p>
<h2>Site Plan</h2>
<p><figure id="attachment_757" aria-describedby="caption-attachment-757" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-757" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout-1024x636.jpg" alt="Plan of the site" width="1024" height="636" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout-1024x636.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout-300x186.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout-768x477.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/site-layout.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-757" class="wp-caption-text">Plan of the site</figcaption></figure></p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.powerstations.uk/ironbridge-b-power-station-shropshire/feed/</wfw:commentRss>
			<slash:comments>2</slash:comments>
		
		
			</item>
		<item>
		<title>Ironbridge B Power Station &#8211; Turbines</title>
		<link>https://www.powerstations.uk/ironbridge-turbines/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Tue, 15 Aug 2017 20:11:39 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=129</guid>

					<description><![CDATA[Ironbridge Power Station had two 500 MW turbo-generator sets manufactured by AEI.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-627 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-cover-1024x304.jpg" alt="Ironbridge Power Station Turbine Hall" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-cover-768x228.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-cover.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>Ironbridge Power Station had two 500 MW turbo-generator sets manufactured by AEI. The turbine arrangement consisted of one high pressure (HP) turbine, one intermediate pressure (IP) turbine, followed by three low pressure (LP) turbines.</p>
<figure id="attachment_650" aria-describedby="caption-attachment-650" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide.jpg"><img loading="lazy" decoding="async" class="wp-image-650 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide-1024x227.jpg" alt="Side elevation of unit 2 turbo-generator set" width="1024" height="227" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide-1024x227.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide-300x67.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide-768x170.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbine-wide.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-650" class="wp-caption-text">Side elevation of unit 2 turbo-generator set</figcaption></figure>
<figure id="attachment_718" aria-describedby="caption-attachment-718" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/section-through-turbine.jpg"><img loading="lazy" decoding="async" class="wp-image-718 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/section-through-turbine-1024x330.jpg" alt="Section Through Turbine - On display in the admin offices" width="1024" height="330" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/section-through-turbine-1024x330.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/section-through-turbine-300x97.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/section-through-turbine-768x248.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-718" class="wp-caption-text">Section Through Turbine &#8211; On display in the admin offices</figcaption></figure>
<h3>Ironbridge B Generating Units</h3>
<p>List of power generating units at Ironbridge B Power Station:<br />
<div class="supsystic-table-loader spinner"></div><div id="supsystic-table-3_87057" class="supsystic-tables-wrap " style=" width:100%; visibility: hidden; " data-table-width-fixed="100%" ><table id="supsystic-table-3" class="supsystic-table compact nowrap paragraphMode border stripe lightboxImg row-border" data-id="3" data-view-id="3_87057" data-title="Ironbridge B Generating Units" data-currency-format="$1,000.00" data-percent-format="10.00%" data-date-format="DD.MM.YYYY" data-time-format="HH:mm" data-features="[&quot;after_table_loaded_script&quot;]" data-search-value="" data-lightbox-img="" data-head="on" data-head-rows-count="1" data-fixed-cols="on" data-fixed-left="1" data-fixed-right="0" data-pagination-length="50,100,All" data-auto-index="off" data-searching-settings="{&quot;minChars&quot;:&quot;0&quot;}" data-lang="default" data-override="{&quot;emptyTable&quot;:&quot;&quot;,&quot;info&quot;:&quot;&quot;,&quot;infoEmpty&quot;:&quot;&quot;,&quot;infoFiltered&quot;:&quot;&quot;,&quot;lengthMenu&quot;:&quot;&quot;,&quot;search&quot;:&quot;&quot;,&quot;zeroRecords&quot;:&quot;&quot;,&quot;file&quot;:&quot;default&quot;}" data-merged="[]" data-responsive-mode="2" data-from-history="0" ><thead><tr><th data-cell-id="A1" data-x="0" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Unit Name" data-order="Unit Name" style="min-width:14.2857%; width:14.2857%;" >Unit Name </th><th data-cell-id="B1" data-x="1" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Capacity" data-order="Capacity" style="min-width:14.2857%; width:14.2857%;" >Capacity </th><th data-cell-id="C1" data-x="2" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Commissioned" data-order="Date &lt;br /&gt;Commissioned" style="min-width:14.2857%; width:14.2857%;" >Date <br />Commissioned </th><th data-cell-id="D1" data-x="3" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Decommissioned" data-order="Date &lt;br /&gt;Decommissioned" style="min-width:14.2857%; width:14.2857%;" >Date <br />Decommissioned </th><th data-cell-id="E1" data-x="4" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Turbine/Generator &lt;br /&gt;Manufacturer" data-order="Turbine/Generator &lt;br /&gt;Manufacturer" style="min-width:14.2857%; width:14.2857%;" >Turbine/Generator <br />Manufacturer </th><th data-cell-id="F1" data-x="5" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Boiler &lt;br /&gt;Manufacturer" data-order="Boiler &lt;br /&gt;Manufacturer" style="min-width:14.2857%; width:14.2857%;" >Boiler <br />Manufacturer </th><th data-cell-id="G1" data-x="6" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Notes" data-order="Notes" style="min-width:14.2857%; width:14.2857%;" >Notes </th></tr></thead><tbody><tr style="height:px" ><td data-cell-id="A2" data-x="0" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Unit 1" data-order="Unit 1" >Unit 1 </td><td data-cell-id="B2" data-x="1" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="500 MW" data-order="500 MW" >500 MW </td><td data-cell-id="C2" data-x="2" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="11 June 1969" data-order="11 June 1969" >11 June 1969 </td><td data-cell-id="D2" data-x="3" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="4 February 2014" data-order="4 February 2014" >4 February 2014 </td><td data-cell-id="E2" data-x="4" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F2" data-x="5" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Forster Wheeler" data-order="Forster Wheeler" >Forster Wheeler </td><td data-cell-id="G2" data-x="6" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Taken out of service &lt;br /&gt;following a major fire." data-order="Taken out of service &lt;br /&gt;following a major fire." >Taken out of service <br />following a major fire. </td></tr><tr style="height:px" ><td data-cell-id="A3" data-x="0" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Unit 2" data-order="Unit 2" >Unit 2 </td><td data-cell-id="B3" data-x="1" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="500 MW" data-order="500 MW" >500 MW </td><td data-cell-id="C3" data-x="2" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="11 June 1969" data-order="11 June 1969" >11 June 1969 </td><td data-cell-id="D3" data-x="3" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="20 November 2015" data-order="20 November 2015" >20 November 2015 </td><td data-cell-id="E3" data-x="4" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="AEI" data-order="AEI" >AEI </td><td data-cell-id="F3" data-x="5" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Forster Wheeler" data-order="Forster Wheeler" >Forster Wheeler </td><td data-cell-id="G3" data-x="6" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="" data-order="" ></td></tr></tbody></table><!-- /#supsystic-table-3.supsystic-table --></div><!-- /.supsystic-tables-wrap --><!-- Tables Generator by Supsystic --><!-- Version:1.10.31 --><!-- http://supsystic.com/ --><a title="WordPress Data Table Plugin" style="display:none;" href="https://supsystic.com/plugins/wordpress-data-table-plugin/?utm_medium=love_link" target="_blank">WordPress Data Table Plugin</a></p>
<h2>Turbine Hall Pictures</h2>
<figure id="attachment_652" aria-describedby="caption-attachment-652" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11.jpg"><img loading="lazy" decoding="async" class="wp-image-652 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-1024x416.jpg" alt="Unit Two Turbo Generator with the exciter on the left, alternator central and LP turbines to the right" width="1024" height="416" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-1024x416.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-300x122.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11-768x312.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-11.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-652" class="wp-caption-text">Unit Two Turbo Generator with the exciter on the left, alternator central and LP turbines to the right</figcaption></figure>

<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-300x200.jpg" class="attachment-medium size-medium" alt="Turbines viewed from the crane" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-9/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-9-300x200.jpg" class="attachment-medium size-medium" alt="Turbine set with an array of associated equipment below" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-9-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-9-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-9-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-9.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-6-300x200.jpg" class="attachment-medium size-medium" alt="Unit Two viewed from the alternator end" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-3/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-3-300x200.jpg" class="attachment-medium size-medium" alt="The three low pressure turbines of unit two" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-3-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-3-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-3-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-3.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-10/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-10-300x200.jpg" class="attachment-medium size-medium" alt="High pressure turbine with local control panel" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-10-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-10-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-10-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-10.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-turbines-8/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-8-300x200.jpg" class="attachment-medium size-medium" alt="Overview of the turbine hall" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-8-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-8-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-8-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-turbines-8.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h2><a name="fires"></a>Fires at Ironbridge</h2>
<p>Two major incidents have occurred at Ironbridge B involving fire.</p>
<figure id="attachment_415" aria-describedby="caption-attachment-415" style="width: 208px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-415" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3-208x300.jpg" alt="Fire-damaged turbines following the 1998 fire" width="208" height="300" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3-208x300.jpg 208w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3-768x1108.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3-710x1024.jpg 710w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-3.jpg 1420w" sizes="(max-width: 208px) 100vw, 208px" /></a><figcaption id="caption-attachment-415" class="wp-caption-text">Fire-damaged turbines following the 1998 fire</figcaption></figure>
<figure id="attachment_659" aria-describedby="caption-attachment-659" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-7.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-659" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-7-300x200.jpg" alt="Smoke and flames emanating from the burning turbine hall in 1998" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-7-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-7-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-7.jpg 1000w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-659" class="wp-caption-text">Smoke and flames emanating from the burning turbine hall in 1998</figcaption></figure>
<h3>1998 Turbine Fire</h3>
<p>The first incident took place on 10th October 1998 when one of the turbines caught fire, causing explosions within the turbine hall. The entire turbine hall required reconstruction.</p>
<h3>2014 Turbine Fire</h3>
<p>Unit One was retired following a major fire around 6am on 4th February 2014. The fire destroyed the alternator and caused extensive damage to the turbines, condensers and associated equipment. The decision was made against repairing the damage, and the unit was not returned to service.</p>
<p>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-fire-damage-8/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-8-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Smoke and flames in the turbine hall" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-8-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-8-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-fire-damage-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Fire damaged remains of alternator" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-fire-damage-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Fire damaged turbo generator" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/ironbridge-turbines/ironbridge-fire-damage-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="The fire damaged Unit One" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-fire-damage-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<br />
</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/ironbridge-turbines/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ironbridge B Power Station – Boiler House and Mill</title>
		<link>https://www.powerstations.uk/ironbridge-boiler-house/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Wed, 16 Aug 2017 10:25:33 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=183</guid>

					<description><![CDATA[The boiler house at Ironbridge B is a mostly metal-clad structure. The boiler house contained two boilers manufactured by Forster Wheeler, along with the associated coal delivery systems and mills.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-624 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-cover-1024x304.jpg" alt="Ironbridge Power Station Boiler House" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-cover-768x228.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-cover.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_711" aria-describedby="caption-attachment-711" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-711" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill-300x298.jpg" alt="A worker inspecting glass-lined fuel bunker in 1993" width="300" height="298" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill-300x298.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill-768x764.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill-1024x1018.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/glass-lined-bunker-and-mill.jpg 1434w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-711" class="wp-caption-text">A worker inspecting glass-lined fuel bunker in 1993</figcaption></figure>
<p>The boiler house at Ironbridge B is a mostly metal-clad structure, and much attention to detail during it&#8217;s design and construction had been paid. Various other cladding materials had been used for some surfaces creating bold cubic masses.</p>
<p>The boiler house contained two boilers manufactured by Forster Wheeler. Along with the boilers were the associated coal delivery systems and mills.</p>
<p>The mills had been converted to process biomass as part of the conversion in 2012, and an array of new equipment was fitted to replace the old coal mills.</p>
<h2>Boiler House Pictures</h2>

<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-12/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-300x200.jpg" class="attachment-medium size-medium" alt="Gantries around the boilers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-12.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-14/'><img loading="lazy" decoding="async" width="300" height="202" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-14-300x202.jpg" class="attachment-medium size-medium" alt="" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-14-300x202.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-14-768x518.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-14-1024x691.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-14.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-11/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-11-300x200.jpg" class="attachment-medium size-medium" alt="Pipes behind a boiler" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-11-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-11-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-11-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-11.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-2/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-2-300x200.jpg" class="attachment-medium size-medium" alt="Various pipelines around the boilers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-2-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-2-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-2-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-2.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-10/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-10-300x200.jpg" class="attachment-medium size-medium" alt="Heater and flue gas duct" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-10-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-10-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-10-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-10.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-5/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-5-300x200.jpg" class="attachment-medium size-medium" alt="Orange pipes carry pulverised fuel to the boilers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-5.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h2>Fuel Delivery and Mill Pictures</h2>
<p>The mills had been fitted with new equipment to process biomass in 2012</p>
<p>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-15/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-15-300x200.jpg" class="attachment-medium size-medium" alt="Biomass mill" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-15-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-15-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-15-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-15.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-6-300x200.jpg" class="attachment-medium size-medium" alt="Rear of the mills" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-4/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-4-300x200.jpg" class="attachment-medium size-medium" alt="Dust hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-4.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boilers-13/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-13-300x200.jpg" class="attachment-medium size-medium" alt="Enclosed conveyor for transportation of biomass" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-13-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-13-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-13-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boilers-13.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boiler-house-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-6-300x200.jpg" class="attachment-medium size-medium" alt="Shuttle conveyor" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-boiler-house/ironbridge-boiler-house-5/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-5-300x200.jpg" class="attachment-medium size-medium" alt="Coal conveyors" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-boiler-house-5.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<br />
</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/ironbridge-boiler-house/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ironbridge B Power Station – Control Room</title>
		<link>https://www.powerstations.uk/ironbridge-control-room/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Wed, 16 Aug 2017 10:25:59 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=185</guid>

					<description><![CDATA[The control room at Ironbridge had been refitted with a fully computerised system - the Advanced Plant Management System (APMS).]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-625 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-cover-1024x304.jpg" alt="Ironbridge Power Station Control Room" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-cover-768x228.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-cover.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The control room at Ironbridge incorporated a fully computerised system &#8211; the Advanced Plant Management System (APMS). This consisted of three banks of large rear projection screens around two operator workstations and an engineering workstation.</p>
<p>APMS completely replaced the original control desks, which were arranged over a much larger space. The upgrade was completed in 1997. One of the original control panels remains in the open space which was freed up when the new control room was fitted.</p>
<h2>Original Control Room Pictures</h2>

<a href='https://www.powerstations.uk/ironbridge-control-room/original-control-room/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-300x200.jpg" class="attachment-medium size-medium" alt="The original control room in 1993. Note the illuminated ceiling" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-768x513.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room-1024x684.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/original-control-room.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/operator-in-control-room/'><img loading="lazy" decoding="async" width="300" height="288" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/operator-in-control-room-300x288.jpg" class="attachment-medium size-medium" alt="Operators at the panels of the original control room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/operator-in-control-room-300x288.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/operator-in-control-room-768x738.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/operator-in-control-room-1024x984.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/operator-in-control-room.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-5/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-5-300x200.jpg" class="attachment-medium size-medium" alt="One panel from the original control room was retained" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-5.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h2>APMS Control Room Pictures (1997 onwards)</h2>

<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-300x200.jpg" class="attachment-medium size-medium" alt="Control room from behind the engineering workstation" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-7/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-7-300x200.jpg" class="attachment-medium size-medium" alt="Engineering workstation" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-7-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-7-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-7-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-7.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-6-300x200.jpg" class="attachment-medium size-medium" alt="One of the large rear projection screens showing plant status" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-8/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-8-300x200.jpg" class="attachment-medium size-medium" alt="New control room to the left. The original control room took up all this space. Note the light-up ceiling was retained" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-8-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-8-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-8-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-8.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-4/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-4-300x200.jpg" class="attachment-medium size-medium" alt="Old panels still in use behind the new control room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-4.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-control-room/ironbridge-control-room-3/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-3-300x200.jpg" class="attachment-medium size-medium" alt="Office to one side of the control room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-3-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-3-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-3-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-control-room-3.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/ironbridge-control-room/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ironbridge B Power Station – Admin, Bathouse &#038; Medical</title>
		<link>https://www.powerstations.uk/ironbridge-admin-medical/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Wed, 16 Aug 2017 10:26:13 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=187</guid>

					<description><![CDATA[The administration block at Ironbridge B is a free-standing building, separate to the main power station, containing the offices, laboratory, bathhouse and medical facilities.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-623 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-cover-1024x304.jpg" alt="Ironbridge Power Station Admin Block" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-cover-768x228.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-cover.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The administration block at Ironbridge B is a free-standing building, separate to the main power station. The admin block continues the theme of concrete panelling used elsewhere around the site, albeit with extensive use of large floor to ceiling windows. Period fittings within the administration block included a board room, containing a mosaic that reference the industries of the Ironbridge Gorge, and a grand entrance hall with a metallic mural.</p>
<h2>Admin Block Pictures</h2>

<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-6/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-6-300x200.jpg" class="attachment-medium size-medium" alt="Entrance to the admin block" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-6-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-6-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-6-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-6.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-2/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-2-300x200.jpg" class="attachment-medium size-medium" alt="The last worker getting a medical checkup" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-2-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-2-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-2-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-2.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-5/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-5-300x200.jpg" class="attachment-medium size-medium" alt="Laboratory" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-5-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-5.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-4/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-4-300x200.jpg" class="attachment-medium size-medium" alt="CEGB jacket hanging on locker door" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-4-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-4-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-4-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-4.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-1-300x200.jpg" class="attachment-medium size-medium" alt="Lockers in the bathhouse" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-admin-block-7/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-7-300x200.jpg" class="attachment-medium size-medium" alt="" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-7-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-7-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-7-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-admin-block-7.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h3>Mosaic</h3>
<p>The conference room contained a mosaic which had been donated by a local school many years ago, depicting the history of industry in the area. The mosaic was returned to the school prior to demolition.</p>
<figure id="attachment_728" aria-describedby="caption-attachment-728" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-728" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2-1024x534.jpg" alt="The mosaic depicts the history of industry around the Ironbridge Gorge and surrounding areas" width="1024" height="534" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2-1024x534.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2-300x156.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2-768x400.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-2.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-728" class="wp-caption-text">The mosaic depicts the history of industry around the Ironbridge Gorge and surrounding areas</figcaption></figure>

<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-mosaic-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-1-300x200.jpg" class="attachment-medium size-medium" alt="The mosaic on display in the conference room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-admin-medical/ironbridge-mosaic-3/'><img loading="lazy" decoding="async" width="300" height="194" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-3-300x194.jpg" class="attachment-medium size-medium" alt="Mosaic - Made by pupils at St. Martins Modern School 1966-1968" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-3-300x194.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-mosaic-3.jpg 516w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/ironbridge-admin-medical/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Ironbridge B Power Station – Cooling Towers</title>
		<link>https://www.powerstations.uk/ironbridge-cooling-towers/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Wed, 16 Aug 2017 10:26:25 +0000</pubDate>
				<category><![CDATA[Ironbridge B Power Station]]></category>
		<guid isPermaLink="false">http://www.k-drive.co.uk/powerstations/?p=189</guid>

					<description><![CDATA[The four cooling towers at Ironbridge B were unique in that they were constructed using concrete that had a red pigment added to give the towers a pinky hue to help them blend into the surroundings.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter size-large wp-image-626" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-cover-1024x304.jpg" alt="Ironbridge Power Station Cooling Towers" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-cover-768x228.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-cover.jpg 1500w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_644" aria-describedby="caption-attachment-644" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-2.jpg"><img loading="lazy" decoding="async" class="wp-image-644 size-medium" src="http://powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-2-300x221.jpg" alt="Aerial image of Ironbridge's Cooling Towers" width="300" height="221" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-2-300x221.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-2.jpg 598w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-644" class="wp-caption-text">Aerial image of Ironbridge&#8217;s Cooling Towers</figcaption></figure>
<p>The cooling towers at Ironbridge B were unique in that they were constructed using concrete that had a red pigment added to give the towers a pinky hue. A great deal of effort had been taken to ensure the power station would blend into the surrounding as much as possible, and as part of this effort the decision was made to colour the cooling towers to match the surrounding soil colour.</p>
<p>&nbsp;</p>
<p>&nbsp;</p>
<h2>Cooling Tower Pictures</h2>
<p>
<a href='https://www.powerstations.uk/ironbridge-b-power-station-shropshire/ironbridge-external-cooling-tower/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-300x200.jpg" class="attachment-medium size-medium" alt="Ironbridge Power Station behind one of the cooling towers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-external-cooling-tower.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-cooling-towers/ironbridge-cooling-towers-3/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-3-300x200.jpg" class="attachment-medium size-medium" alt="Ironbridge cooling towers viewed from the ground" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-3-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-3-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-3-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-3.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/ironbridge-cooling-towers/ironbridge-cooling-towers-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-300x200.jpg" class="attachment-medium size-medium" alt="Three of the four cooling towers viewed from the power station" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2017/08/ironbridge-cooling-towers-1.jpg 1500w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<br />
</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/ironbridge-b-power-station-shropshire/"><i class="arrow icn-left-open-big"></i>Back to Ironbridge main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/ironbridge-cooling-towers/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
	<ins class="adsbygoogle" style="display:block" data-ad-client="ca-pub-9853931659802057" data-ad-slot="4954481773" data-ad-format="auto" data-full-width-responsive="true"></ins><script>(adsbygoogle = window.adsbygoogle || []).push({});</script></channel>
</rss>
