<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Rugeley B Power Station &#8211; Power Stations of the UK</title>
	<atom:link href="https://www.powerstations.uk/category/rugeley-b-power-station/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.powerstations.uk</link>
	<description>Documenting the decline of coal and oil fired electricity generation in the UK</description>
	<lastBuildDate>Tue, 25 Apr 2023 18:53:23 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.6.4</generator>

<image>
	<url>https://www.powerstations.uk/wp-content/uploads/sites/3/2023/04/cropped-power-stations-icon-32x32.png</url>
	<title>Rugeley B Power Station &#8211; Power Stations of the UK</title>
	<link>https://www.powerstations.uk</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Rugeley B Power Station, Staffordshire</title>
		<link>https://www.powerstations.uk/rugeley-b-power-station-staffordshire/</link>
					<comments>https://www.powerstations.uk/rugeley-b-power-station-staffordshire/#comments</comments>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Fri, 16 Mar 2018 17:48:50 +0000</pubDate>
				<category><![CDATA[Power Stations]]></category>
		<category><![CDATA[Rugeley B Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=1712</guid>

					<description><![CDATA[Completed in 1972, Rugeley B in Staffordshire was a 1000 MW power station with two Parsons generating units. The station closed in 2016.]]></description>
										<content:encoded><![CDATA[<p><img fetchpriority="high" decoding="async" class="header_image aligncenter wp-image-2195 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-cover-1024x340.jpg" alt="Rugeley B Power Station, Staffordshire" width="1024" height="340" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-cover.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-cover-300x100.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-cover-768x255.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The Rugeley power stations were a series of two coal-fired power stations located on the River Trent at Rugeley in Staffordshire. Construction of the first power station at the site, Rugeley ‘A’ station started in 1956 and station&#8217;s generating sets were commissioned between 1961 and 1962.</p>
<figure id="attachment_2205" aria-describedby="caption-attachment-2205" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s.jpg"><img decoding="async" class="size-medium wp-image-2205" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s-300x200.jpg" alt="Rugeley A and B, with Lea Hall Colliery in the foreground" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s.jpg 600w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2205" class="wp-caption-text">Rugeley A and B, with Lea Hall Colliery in the foreground</figcaption></figure>
<p>The ‘A’ station took coal directly from the neighbouring Lea Hall Colliery by conveyor belt. The colliery was put into production some 6 months before the first generating unit was commissioned in the power station. This was the first joint venture between the Central Electricity Generating Board (CEGB) and the National Coal Board (NCB). The Lea Hall colliery was closed on 24 January 1991, meaning all coal burned in the stations needed to be delivered by rail.</p>
<figure id="attachment_2249" aria-describedby="caption-attachment-2249" style="width: 300px" class="wp-caption alignleft"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3.jpg"><img decoding="async" class="size-medium wp-image-2249" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3-300x225.jpg" alt="Rugeley B cooling towrs and power station" width="300" height="225" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3-300x225.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3-768x576.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3-1024x768.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-3.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2249" class="wp-caption-text">Rugeley B cooling towrs and power station</figcaption></figure>
<p>Construction of Rugeley ‘B’ power station began in 1965, with completion of the station in 1972. It had an output of 1,000 megawatts (MW) and had a 400 kilovolt (kV) connection to the national grid. With both stations in operation, 850 people were employed at the stations in 1983.</p>
<p>The two stations were initially operated by the Central Electricity Generating Board, but following privatisation in 1990, were handed over to National Power. In July 1996 the Rugeley B power station was bought by Eastern Generation, itself acquired by TXU Europe. Rugeley B was subsequently sold to International Power plc in July 2001. It remains under the same ownership, though International Power later merged with GDF Suez in 2011.</p>
<figure id="attachment_2250" aria-describedby="caption-attachment-2250" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2250" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney-300x200.jpg" alt="Flue Gas Desulphurisation (FGD) Plant and new chimney" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-fgd-chimney.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2250" class="wp-caption-text">Flue Gas Desulphurisation (FGD) Plant and new chimney</figcaption></figure>
<p>Construction of a Flue Gas Desulfurization plant started in early 2007 and it was commissioned at the B station in 2009. This allowed the station to comply with environmental legislation in force at the time and continue generating electricity.</p>
<p>In February 2016 it was announced that the power station would close in the summer of 2016. An announcement by owners, Engie blamed a deterioration in market conditions which included a fall in market prices and increasing carbon costs. Rugeley Power Station ceased all operations on Wednesday 8 June 2016. Decommissioning began in June 2016. All buildings and structures on site have now been demolished.</p>
<h2>Buildings and Plant Detail</h2>
<!-- imagelinks begin -->
<style>
@import url("https://www.powerstations.uk/wp-content/plugins/imagelinks/lib/imagelinks.theme.default.css?ver=imagelinks");
</style>
<div id="imgl-data-corix-2143" style="display:none;">
<div id="imgl-data-corix-popover-0"><h4 style="text-align: center;"><a href="http://powerstations.uk/rugeley-b-turbines/">Turbine Hall</a><br /><a href="http://powerstations.uk/rugeley-b-turbines/"><img loading="lazy" decoding="async" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb-150x150.jpg" alt="Rugeley B Turbines" width="150" height="150" class="aligncenter size-thumbnail wp-image-2254" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-corix-popover-1"><h4 style="text-align: center;"><a href="http://powerstations.uk/rugeley-b-boiler-house/">Boiler House &amp;<br />Coal Processing</a><br /><a href="http://powerstations.uk/rugeley-b-boiler-house/"><img loading="lazy" decoding="async" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb-150x150.jpg" alt="Rugeley B Boilers, Mills and Coal Plant" width="150" height="150" class="aligncenter size-thumbnail wp-image-2252" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-corix-popover-2"><h4 style="text-align: center;"><a href="http://powerstations.uk/rugeley-b-control-room/">Control Room</a><br /><a href="http://powerstations.uk/rugeley-b-control-room/"><img loading="lazy" decoding="async" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb-150x150.jpg" alt="Rugeley B Control Room" width="150" height="150" class="aligncenter size-thumbnail wp-image-2253" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
<div id="imgl-data-corix-popover-3"><h4 style="text-align: center;"><a href="http://powerstations.uk/rugeley-b-workshops-and-admin/">Admin and<br />Workshops</a><br /><a href="http://powerstations.uk/rugeley-b-workshops-and-admin/"><img loading="lazy" decoding="async" class="aligncenter size-thumbnail wp-image-2251" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb-150x150.jpg" alt="Rugeley B Workshops and Admin" width="150" height="150" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb.jpg 200w" sizes="(max-width: 150px) 100vw, 150px" /></a></h4></div>
</div>
<img decoding="async" id="imgl-corix-2143" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/02/rugeley-site-plan.gif" data-imgl-src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/02/rugeley-site-plan.gif" alt=""><script type="text/javascript">
function imgl_init_corix_2143() {
jQuery( "#imgl-corix-2143" ).imagelinks({
theme: "imgl-theme-default",
popover: true,
popoverPlacement: "top",
popoverShowTrigger: "hover",
popoverHideTrigger: "leave",
hotSpotBelowPopover: true,
mobile: false,
hotSpots: [
{
x: 0.51043,
y: 0.25859,
link: "http://powerstations.uk/rugeley-b-turbines/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-corix-popover-0",
popoverShow: false,
},
{
x: 0.44955,
y: 0.30359,
link: "http://powerstations.uk/rugeley-b-boiler-house/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-corix-popover-1",
popoverShow: false,
},
{
x: 0.54406,
y: 0.41359,
link: "http://powerstations.uk/rugeley-b-control-room/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-corix-popover-2",
popoverShow: false,
},
{
x: 0.4848,
y: 0.45359,
link: "http://powerstations.uk/rugeley-b-workshops-and-admin/",
linkNewWindow: false,
imageUrl: "",
popover: true,
popoverHtml: true,
popoverLazyload: false,
popoverSelector: "#imgl-data-corix-popover-3",
popoverShow: false,
},
]
});
}
if(window.attachEvent) {window.attachEvent("onload",imgl_init_corix_2143)}
else if(window.addEventListener) {window.addEventListener("load",imgl_init_corix_2143, false)}
</script>
<!-- imagelinks end -->

<div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/rugeley-b-turbines/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2254" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb.jpg" alt="Rugeley B Turbines" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-turbines-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Turbine Hall</a></p>
<p class="smaller_txt">Rugeley B had 2 x 500MW turbine-generator sets manufactured by Parsons</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-turbines/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/rugeley-b-boiler-house/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2252" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb.jpg" alt="Rugeley B Boilers, Mills and Coal Plant" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-boilers-mills-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Boiler House and Coal Processing</a></p>
<p class="smaller_txt">The boiler house contains the two coal-fired boilers fed from the coal plant</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-boiler-house/">Read more</a></p>
</div>
<div class="clearer"></div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/rugeley-b-control-room/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2253" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb.jpg" alt="Rugeley B Control Room" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-control-room-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Control Room</a></p>
<p class="smaller_txt">The control room at Rugeley B had been refitted with APMS</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-control-room/">Read more</a></p>
</div>
<div class="article_link_box_50">
<p><a href="http://powerstations.uk/rugeley-b-workshops-and-admin/"><img loading="lazy" decoding="async" class="alignleft size-full wp-image-2251" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb.jpg" alt="Rugeley B Workshops and Admin" width="200" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/tilbury-workshops-admin-thumb-150x150.jpg 150w" sizes="(max-width: 200px) 100vw, 200px" />Workshops &amp; Admin</a></p>
<p class="smaller_txt">The admin block, workshops, canteen and bathhouse</p>
<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-workshops-and-admin/">Read more</a></p>
</div>
<div class="clearer"></div>
</div>
<h2>Rugeley B Image Gallery</h2>
<p class="green_outline">Visit the plant detail pages above to view more images from each area of the power plant</p>

<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-b-power-station-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Rugeley B power station and cooling towers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-power-station-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-b-cooling-towers/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-cooling-towers-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="The four cooling towers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-cooling-towers-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-cooling-towers-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-b-night/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-night-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Viewed at night across the coal store" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-night-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-night-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-power-stations/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-power-stations-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Photo showing the A and B stations" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-power-stations-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-power-stations-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Model of Rugeley A and B stations" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 7" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="General view of the turbine hall with Unit 7 in the foreground" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Engineering station between unit control desks" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Documents and Schematics</h2>

<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-b-site-plan-2/'><img loading="lazy" decoding="async" width="300" height="179" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2-300x179.jpg" class="attachment-medium size-medium" alt="Rugeley B Site Plan" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2-300x179.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2-768x459.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2-1024x612.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2-200x120.jpg 200w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-2.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-power-station-staffordshire/rugeley-b-site-plan-1/'><img loading="lazy" decoding="async" width="300" height="183" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1-300x183.jpg" class="attachment-medium size-medium" alt="Rugeley B Power Station Layout" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1-300x183.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1-768x468.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1-1024x624.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1-570x350.jpg 570w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-site-plan-1.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbine-schematic/'><img loading="lazy" decoding="async" width="300" height="168" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-300x168.jpg" class="attachment-medium size-medium" alt="Diagram of turbine as seen on display in the turbine hall (showing fire protection)" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-300x168.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-768x431.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-1024x574.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-1110x624.jpg 1110w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-528x297.jpg 528w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a>

]]></content:encoded>
					
					<wfw:commentRss>https://www.powerstations.uk/rugeley-b-power-station-staffordshire/feed/</wfw:commentRss>
			<slash:comments>18</slash:comments>
		
		
			</item>
		<item>
		<title>Rugeley B Power Station &#8211; Turbines</title>
		<link>https://www.powerstations.uk/rugeley-b-turbines/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Fri, 16 Mar 2018 17:49:00 +0000</pubDate>
				<category><![CDATA[Rugeley B Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=1714</guid>

					<description><![CDATA[The turbine hall at Rugeley contains two C. A. Parsons generating sets, each have a capacity of 500 MW. There were two additional Gas Turbine generators capable of generating 25 MW each.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-2246 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-cover-1024x304.jpg" alt="Rugeley B Turbine Hall and Gas Turbines" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<p>The turbine hall at Rugeley contains two C. A. Parsons generating sets, each have a capacity of 500 MW. The two units were numbered 6 and 7, a continuation of the numbering from the &#8216;A&#8217; station. Unit 6 was commissioned on 9th January 1970, and Unit 7 later that year on 15th October 1970.</p>
<figure id="attachment_2242" aria-describedby="caption-attachment-2242" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5.jpg"><img loading="lazy" decoding="async" class="wp-image-2242 size-medium" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5-300x200.jpg" alt="Unit 7 Alternator and Exciter" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-5.jpg 2000w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2242" class="wp-caption-text">Unit 7 Alternator and Exciter</figcaption></figure>
<p>The turbines are Parsons TC2F110 model, consisting of one High Pressure (HP), one Intermediate Pressure (IP) and three Low Pressure (LP) stages. Steam is reheated after the HP stage.</p>
<h3>Rugeley B Generating Units</h3>
<div class="supsystic-table-loader spinner"style="background-color:#000000"></div><div id="supsystic-table-11_64404" class="supsystic-tables-wrap " style=" width:100%; visibility: hidden; " data-table-width-fixed="100%" data-table-width-mobile="100%" ><table id="supsystic-table-11" class="supsystic-table compact nowrap paragraphMode border stripe lightboxImg row-border" data-id="11" data-view-id="11_64404" data-title="Rugeley Generating Units" data-currency-format="$1,000.00" data-percent-format="10.00%" data-date-format="DD.MM.YYYY" data-time-format="HH:mm" data-features="[&quot;after_table_loaded_script&quot;]" data-search-value="" data-lightbox-img="" data-head="on" data-head-rows-count="1" data-fixed-cols="on" data-fixed-left="1" data-fixed-right="0" data-pagination-length="50,100,All" data-auto-index="off" data-searching-settings="{&quot;columnSearchPosition&quot;:&quot;bottom&quot;,&quot;minChars&quot;:&quot;0&quot;}" data-lang="default" data-override="{&quot;emptyTable&quot;:&quot;&quot;,&quot;info&quot;:&quot;&quot;,&quot;infoEmpty&quot;:&quot;&quot;,&quot;infoFiltered&quot;:&quot;&quot;,&quot;lengthMenu&quot;:&quot;&quot;,&quot;search&quot;:&quot;&quot;,&quot;zeroRecords&quot;:&quot;&quot;,&quot;exportLabel&quot;:&quot;&quot;,&quot;file&quot;:&quot;default&quot;}" data-merged="[]" data-responsive-mode="2" data-from-history="0" ><thead><tr><th data-cell-id="A1" data-x="0" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Unit Name" data-order="Unit Name" style="min-width:16.6667%; width:16.6667%;" >Unit Name </th><th data-cell-id="B1" data-x="1" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Capacity" data-order="Capacity" style="min-width:16.6667%; width:16.6667%;" >Capacity </th><th data-cell-id="C1" data-x="2" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Commissioned" data-order="Date &lt;br /&gt;Commissioned" style="min-width:16.6667%; width:16.6667%;" >Date <br />Commissioned </th><th data-cell-id="D1" data-x="3" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Date &lt;br /&gt;Decommissioned" data-order="Date &lt;br /&gt;Decommissioned" style="min-width:16.6667%; width:16.6667%;" >Date <br />Decommissioned </th><th data-cell-id="E1" data-x="4" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Turbine/Generator &lt;br /&gt;Manufacturer" data-order="Turbine/Generator &lt;br /&gt;Manufacturer" style="min-width:16.6667%; width:16.6667%;" >Turbine/Generator <br />Manufacturer </th><th data-cell-id="F1" data-x="5" data-y="1" data-db-index="1" class="" data-cell-type="text" data-original-value="Boiler &lt;br /&gt;Manufacturer" data-order="Boiler &lt;br /&gt;Manufacturer" style="min-width:16.6667%; width:16.6667%;" >Boiler <br />Manufacturer </th></tr></thead><tbody><tr style="height:px" ><td data-cell-id="A2" data-x="0" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Unit 6" data-order="Unit 6" >Unit 6 </td><td data-cell-id="B2" data-x="1" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="500 MW" data-order="500 MW" >500 MW </td><td data-cell-id="C2" data-x="2" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="09 January 1970" data-order="09 January 1970" >09 January 1970 </td><td data-cell-id="D2" data-x="3" data-y="2" data-db-index="2" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="08 June 2016" data-order="08 June 2016" >08 June 2016 </td><td data-cell-id="E2" data-x="4" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Parsons" data-order="Parsons" >Parsons </td><td data-cell-id="F2" data-x="5" data-y="2" data-db-index="2" class="" data-cell-type="text" data-original-value="Foster Wheeler John Brown boilers" data-order="Foster Wheeler John Brown boilers" >Foster Wheeler John Brown boilers </td></tr><tr style="height:px" ><td data-cell-id="A3" data-x="0" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Unit 7" data-order="Unit 7" >Unit 7 </td><td data-cell-id="B3" data-x="1" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="500 MW" data-order="500 MW" >500 MW </td><td data-cell-id="C3" data-x="2" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="15 October 1970" data-order="15 October 1970" >15 October 1970 </td><td data-cell-id="D3" data-x="3" data-y="3" data-db-index="3" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="30 December 2015" data-order="30 December 2015" >30 December 2015 </td><td data-cell-id="E3" data-x="4" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Parsons" data-order="Parsons" >Parsons </td><td data-cell-id="F3" data-x="5" data-y="3" data-db-index="3" class="" data-cell-type="text" data-original-value="Foster Wheeler John Brown boilers" data-order="Foster Wheeler John Brown boilers" >Foster Wheeler John Brown boilers </td></tr><tr style="height:px" ><td data-cell-id="A4" data-x="0" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Unit 16 Gas Turbine" data-order="Unit 16 Gas Turbine" >Unit 16 Gas Turbine </td><td data-cell-id="B4" data-x="1" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="25 MW" data-order="25 MW" >25 MW </td><td data-cell-id="C4" data-x="2" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="" data-order="" ></td><td data-cell-id="D4" data-x="3" data-y="4" data-db-index="4" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="2015" data-order="2015" >2015 </td><td data-cell-id="E4" data-x="4" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Parsons" data-order="Parsons" >Parsons </td><td data-cell-id="F4" data-x="5" data-y="4" data-db-index="4" class="" data-cell-type="text" data-original-value="Rolls Royce Avon 300 GT" data-order="Rolls Royce Avon 300 GT" >Rolls Royce Avon 300 GT </td></tr><tr style="height:px" ><td data-cell-id="A5" data-x="0" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Unit 17 Gas Turbine" data-order="Unit 17 Gas Turbine" >Unit 17 Gas Turbine </td><td data-cell-id="B5" data-x="1" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="25 MW" data-order="25 MW" >25 MW </td><td data-cell-id="C5" data-x="2" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="" data-order="" ></td><td data-cell-id="D5" data-x="3" data-y="5" data-db-index="5" class="" data-cell-type="text" data-cell-format-type="number" data-original-value="2015" data-order="2015" >2015 </td><td data-cell-id="E5" data-x="4" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Parsons" data-order="Parsons" >Parsons </td><td data-cell-id="F5" data-x="5" data-y="5" data-db-index="5" class="" data-cell-type="text" data-original-value="Rolls Royce Avon 300 GT" data-order="Rolls Royce Avon 300 GT" >Rolls Royce Avon 300 GT </td></tr></tbody></table><!-- /#supsystic-table-11.supsystic-table --></div><!-- /.supsystic-tables-wrap --><!-- Tables Generator by Supsystic --><!-- Version:1.10.31 --><!-- http://supsystic.com/ --><a title="WordPress Data Table Plugin" style="display:none;" href="https://supsystic.com/plugins/wordpress-data-table-plugin/?utm_medium=love_link" target="_blank">WordPress Data Table Plugin</a>
<h3>Turbine Statistics</h3>
<p>Unit 6 was last run on 8th June 2016 and had run for a total of 285,595 hrs. It had a total of 2,764 starts (2313 hot and 451 cold) and generated a total of 125,776 GWh (average load 440 MW).</p>
<p>Unit 7 was last run on 15th October 2015 and had run for a total of 289,320 hrs. It had a total of 2,705 starts (2318 hot and 387 cold) and generated a total of 123,501 GWh (average load 427 MW).</p>
<h2>Turbine Hall Pictures</h2>
<figure id="attachment_2236" aria-describedby="caption-attachment-2236" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2236" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-1024x682.jpg" alt="General view of the turbine hall with Unit 7 in the foreground" width="1024" height="682" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-1.jpg 2000w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2236" class="wp-caption-text">General view of the turbine hall with Unit 7 in the foreground</figcaption></figure>

<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 7" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 7 Condenser" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="High and Intermediate pressure turbines" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 7 Alternator" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-7/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-7-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 6 Starting and Standby Feed Pump" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-7-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-7-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-9/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-9-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Starting and Standby Feed Pump" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-9-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-9-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-10/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-10-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 7 HP Heaters" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-10-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-10-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-turbines-8/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-8-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 6 generator transformer oil coolers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-8-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbines-8-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Gas Turbines</h2>
<p>In addition to the two steam turbine units, Rugeley also had two gas turbine generators. These were capable of starting the main generator sets without an electricity supply from the National Grid, and could also provide additional capacity as and when needed. The gas turbines were powered by Rolls Royce Avon 300 series engines, and each had a capacity of 25 MW.</p>

<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-gas-turbines-3/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-3-300x200.jpg" class="attachment-medium size-medium" alt="Gas Turbine Hall" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-3-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-3-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-3-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-3.jpg 2000w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-gas-turbines-1/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-1-300x200.jpg" class="attachment-medium size-medium" alt="Gas turbine Unit 17" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-1-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-1.jpg 2000w" sizes="(max-width: 300px) 100vw, 300px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-turbines/rugeley-b-gas-turbines-2/'><img loading="lazy" decoding="async" width="300" height="200" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-2-300x200.jpg" class="attachment-medium size-medium" alt="Gas turbine Unit 17" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-2-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-2-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-2-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-gas-turbines-2.jpg 2000w" sizes="(max-width: 300px) 100vw, 300px" /></a>

<h2>Documents and Schematics</h2>
<figure id="attachment_2261" aria-describedby="caption-attachment-2261" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2261" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-1024x574.jpg" alt="Diagram of turbine as seen on display in the turbine hall (showing fire protection)" width="1024" height="574" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-1024x574.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-300x168.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-768x431.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic-528x297.jpg 528w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-turbine-schematic.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2261" class="wp-caption-text">Diagram of turbine as seen on display in the turbine hall (showing fire protection)</figcaption></figure>
<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/rugeley-b-turbines/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rugeley B Power Station &#8211; Boiler House &#038; Coal Processing</title>
		<link>https://www.powerstations.uk/rugeley-b-boiler-house/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Fri, 16 Mar 2018 17:49:09 +0000</pubDate>
				<category><![CDATA[Rugeley B Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=1716</guid>

					<description><![CDATA[The boiler house at Rugeley B contained boilers and pulverisers supplied by Foster Wheeler John Brown boilers. Coal was delivered via a rail unloader, replacing an older conveyor from Lea Hall Colliery.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-2207 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-cover-1024x304.jpg" alt="Rugeley B Boiler House and Coal Plant" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_2203" aria-describedby="caption-attachment-2203" style="width: 300px" class="wp-caption alignleft"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2203" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11-300x200.jpg" alt="Boiler house exterior" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-11.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2203" class="wp-caption-text">Boiler house exterior</figcaption></figure>
<p>The boiler house at Rugeley B contained two Foster Wheeler John Brown boilers, one per generating unit. They were coal-fired, radiant boilers with superheaters and economisers. Each unit had 7 pulverised fuel mills, fed from the 14 coal feeders situated above them.</p>
<figure id="attachment_2205" aria-describedby="caption-attachment-2205" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2205" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s-300x200.jpg" alt="Rugeley A and B, with Lea Hall Colliery in the foreground" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-and-lea-hall-colliery-1970s.jpg 600w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2205" class="wp-caption-text">Rugeley A and B, with Lea Hall Colliery in the foreground</figcaption></figure>
<p>Coal for the boilers was originally supplied via a conveyor directly from the neighbouring Lea Hall Colliery. The colliery closed in 1991, meaning from then on all coal needed to be delivered via rail. Rugeley had a rail-unloader, allowing hopper trains to empty their contents directly into the hoppers below. An extensive network of conveyors then transported the coal between the rail-unloader, coal store and the power station itself.</p>
<h2>Mill and Boiler House Pictures</h2>
<figure id="attachment_2200" aria-describedby="caption-attachment-2200" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2200" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2-1024x683.jpg" alt="Pulverised Fuel Mills" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-2.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2200" class="wp-caption-text">Pulverised Fuel Mills</figcaption></figure>

<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-boiler-house-9/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-9-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Coal Feeders" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-9-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-9-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-boiler-house-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Dust mask sign" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-boiler-house-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="FD Fans" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-boiler-house-10/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-10-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Ash hopper doors" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-10-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-boiler-house-10-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Coal Plant Images</h2>
<figure id="attachment_2167" aria-describedby="caption-attachment-2167" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2167" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8-1024x683.jpg" alt="The rail unloading facilities" width="1024" height="683" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-8.jpg 2048w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2167" class="wp-caption-text">The rail unloading facilities</figcaption></figure>

<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Rail unloading shed" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Rail unloading shed" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Conveyors below the rial-unloader hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-7/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-7-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Feeder from the hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-7-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-7-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Feeder from the hoppers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-9/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-9-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Coal plant conveyors" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-9-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-9-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Conveyor into bunkers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-boiler-house/rugeley-b-coal-plant-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Above the bunkers" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-coal-plant-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/rugeley-b-boiler-house/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rugeley B Power Station &#8211; Control Room</title>
		<link>https://www.powerstations.uk/rugeley-b-control-room/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Fri, 16 Mar 2018 17:49:18 +0000</pubDate>
				<category><![CDATA[Rugeley B Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=1718</guid>

					<description><![CDATA[Originally fitted with traditional hard-desk control panels, the control room at Rugeley was modernised in 1998-9, replacing the original control panels with APMS.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-2224 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-cover-1024x304.jpg" alt="Rugeley B Control Room" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_2221" aria-describedby="caption-attachment-2221" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3.jpg"><img loading="lazy" decoding="async" class="size-medium wp-image-2221" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3-300x200.jpg" alt="General view of the control room" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-3.jpg 2000w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2221" class="wp-caption-text">General view of the control room</figcaption></figure>
<p>Originally fitted with traditional hard-desk control panels, the control room at Rugeley was modernised in 1998-9, replacing the original control panels with the Advanced Plant Management System (APMS) softdesk system. The system used Siemens APACS DCS system which replaced the legacy CUTLASS and other hardwired systems.</p>
<p>Each of the two units had its own control station, featuring 21&#8243; displays, large projection screens and an engineering workstation. Common services were supervised from a central desk between the two units with its own displays and a large rear projection screen.</p>
<h2>Control Room Pictures</h2>
<figure id="attachment_2216" aria-describedby="caption-attachment-2216" style="width: 1024px" class="wp-caption aligncenter"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1.jpg"><img loading="lazy" decoding="async" class="size-large wp-image-2216" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1-1024x682.jpg" alt="View across the control room" width="1024" height="682" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1-1024x682.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-1.jpg 2000w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption id="caption-attachment-2216" class="wp-caption-text">View across the control room</figcaption></figure>

<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Engineering station between unit control desks" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Unit 6 control desk" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Behind Unit 6 desk" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-7/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-7-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Engineering Workstation" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-7-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-7-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-8/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-8-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Station Services Panel" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-8-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-8-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-control-room/rugeley-b-control-room-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="400 Kv Control Board" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-control-room-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/rugeley-b-control-room/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Rugeley B Power Station &#8211; Workshops and Admin</title>
		<link>https://www.powerstations.uk/rugeley-b-workshops-and-admin/</link>
		
		<dc:creator><![CDATA[Power Stations of the UK]]></dc:creator>
		<pubDate>Fri, 16 Mar 2018 17:49:31 +0000</pubDate>
				<category><![CDATA[Rugeley B Power Station]]></category>
		<guid isPermaLink="false">http://powerstations.uk/?p=1719</guid>

					<description><![CDATA[The admin block was a separate building and also contained the medical facilities, bathhouse and canteen. The workshops were on a single story, located within the southern end of the main power station building.]]></description>
										<content:encoded><![CDATA[<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<img loading="lazy" decoding="async" class="header_image aligncenter wp-image-2193 size-large" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-cover-1024x304.jpg" alt="Rugeley B Workshops and Admin Block" width="1024" height="304" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-cover-1024x304.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-cover-300x89.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-cover-768x228.jpg 768w" sizes="(max-width: 1024px) 100vw, 1024px" /></p>
<figure id="attachment_2152" aria-describedby="caption-attachment-2152" style="width: 300px" class="wp-caption alignright"><a href="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops.jpg"><img loading="lazy" decoding="async" class="wp-image-2152 size-medium" src="http://powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-300x200.jpg" alt="Rugeley B Workshops (left) and admin block (right) with the link-bridge at the top of the image" width="300" height="200" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-300x200.jpg 300w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-768x512.jpg 768w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops-1024x683.jpg 1024w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-workshops.jpg 2048w" sizes="(max-width: 300px) 100vw, 300px" /></a><figcaption id="caption-attachment-2152" class="wp-caption-text">Rugeley B Workshops (left) and admin block (right) with the link-bridge at the top of the image</figcaption></figure>
<p>The admin and welfare facilities at Rugeley B Power were housed in a separate building, linked to the power station via an link-bridge to the control room block. Along with offices, the admin block contained the medical facilities, bathhouse and canteen.</p>
<p>The workshops were on a single story, located within the southern end of the main power station building.</p>
<h2>Administration Pictures</h2>
<div class="clearer"></div>

<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Entrance to the admin block" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Model of Rugeley A and B stations" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Staff Canteen" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-15/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-15-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Conference room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-15-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-15-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-14/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-14-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Meeting room" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-14-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-14-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-12/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-12-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Workers entrance to bathhouse" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-12-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-12-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Lockers in the bathhouse" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Wash facilities" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-9/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-9-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Staff gym" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-9-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-9-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-13/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-13-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Medical facilities" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-13-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-13-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-10/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-10-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Medical facilities" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-10-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-10-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-admin-block-11/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-11-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Emergency first aid locker" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-11-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-admin-block-11-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<h2>Workshop Pictures</h2>

<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-3/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-3-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="General view of the machine shop" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-3-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-3-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-4/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-4-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Workbenches" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-4-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-4-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-5/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-5-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Workshop lathe" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-5-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-5-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-2/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-2-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Lathes" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-2-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-2-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-6/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-6-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Pashley Courier bicycle" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-6-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-6-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>
<a href='https://www.powerstations.uk/rugeley-b-workshops-and-admin/rugeley-b-workshops-1/'><img loading="lazy" decoding="async" width="150" height="150" src="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-1-150x150.jpg" class="attachment-thumbnail size-thumbnail" alt="Workbenches" srcset="https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-1-150x150.jpg 150w, https://www.powerstations.uk/wp-content/uploads/sites/3/2018/03/rugeley-b-workshops-1-510x510.jpg 510w" sizes="(max-width: 150px) 100vw, 150px" /></a>

<p><a class="btn btn-edit" href="http://powerstations.uk/rugeley-b-power-station-staffordshire/"><i class="arrow icn-left-open-big"></i>Back to Rugeley B main page</a><br />
<div id="respond" class="comment-respond"><h3>Share your thoughts on “”</h3><p>No comments have been posted about  yet.<br />&#9658; <a href="https://www.powerstations.uk/rugeley-b-workshops-and-admin/#comments">Be the first to comment on the main page</a></p></div></p>
]]></content:encoded>
					
		
		
			</item>
	<ins class="adsbygoogle" style="display:block" data-ad-client="ca-pub-9853931659802057" data-ad-slot="4954481773" data-ad-format="auto" data-full-width-responsive="true"></ins><script>(adsbygoogle = window.adsbygoogle || []).push({});</script></channel>
</rss>
